At the first stage – design, supply and installation of engineering systems equipped with the placement systems (30 rack spaces), the 100 kW distribution system based on inline switchboards, raised floor systems with the cold air distribution function, the system of specialised cable ducts for power and data cables based on standard wire trays and chutes installed onto 19” cabinets.

At the second stage – expansion of the existing DPC to 70 cabinets, including demolition of the wall on the working DPC, design, supply and installation of placement and raised floor systems.

At the third stage – expansion of the existing DPC to 108 rack spaces, including design, supply and installation of placement and raised floor systems, as well as the fire extinguishing system.