Design, supply and installation of the engineering infrastructure of the main and backup server rooms based on two ISX Symmetra PX 40 kW, the air conditioning system (2x40 kW), the placement system, the gas fire extinguishing system. At the second stage – modernisation of the UPS system of the main server room before the 2N backup based on Symmetra PX UPS.