Design, supply and installation of the engineering infrastructure for the server room equipped with the UPS system based on UPS Symmеtra PX 48 kW, placement (7 rack spaces for 19” cabinets), air conditioning (2х33 kW), ventilation (air overpressure and gas removal systems), raised floor, climate monitoring and scheduling, gas fire extinguishing systems.