Design, supply and installation of engineering infrastructures for two DPC equipped with the UPS system based on UPS Symmеtra PX 70 kW, placement (17 and 6 rack spaces), air conditioning (3x41 kW and 2х23 kW), ventilation (air overpressure and gas removal systems), raised floor, climate monitoring and dispatching, gas fire extinguishing systems.

Supply of additional air conditioner for the server room, the automatic gas fire extinguishing system.